RFQ
RFQ - 22-AP-ASD-001: Passenger Boarding Bridge Replacement - Baton Rouge Metropolitan Airport
- RFQ#
- 22-AP-ASD-001
- Category
- Architectural Services
- Description
- The Baton Rouge Metropolitan Airport (BTR) proposes to remove and replace six existing Passenger Boarding Bridges (PBB) presently operating in the terminal facility. The Architectural firm must have experience at airports with similar projects. The selected firm must show that they understand how the passenger boarding bridge functions and the importance of their use at airports. The Baton Rouge Metropolitan Airport is expected to receive a federal grant for this project and as such, the selected Architectural firm must have the capability to proceed on the design of the project immediately.
- Contact First Name
- Thomas
- Contact Last Name
- Stephens
- Contact Phone Number
- 2253893186
- Contact Email Address
- TStephens@BRLA.gov
- RFQ Due Date
- 10/21/2022
Project Documents
Filename | Created At | |
---|---|---|
RFQ 22-AP-ASD-001 | 9/30/2022 8:00:02 AM | |
RFQ 22-AP-ASD-001 Public Notice | 9/30/2022 7:59:17 AM |