RFQ

RFQ - 09-ES-PW-017 : Multiple Pump Stations SFL-C-0001 (Nicholson Dr.-Brightside Ln.)

RFQ#
09-ES-PW-017
Category
Wastewater
Description
This project is part of the Baton Rouge Sanitary Sewer Overflow (SSO) Program being implemented under the Consent Decree with the EPA. This project is generally located in the central area of Baton Rouge, LA, as shown in Figure 1. The SFL-C-0001 Pump Stations project includes the following improvements: • Pump Stations – 6 new pump stations using submersible pumps to replace existing pump stations, 1.0 to 9 million gallons per day (MGD) (900 – 7,000 gallons per minute (gpm). All pump stations will include a new standby engine generator to be provided by the Owner, and up to 4 pump stations will include an electrical building.
Contact First Name
Amy Schulz
Contact Last Name
389-5623
RFQ Due Date
9/11/2009

Project Documents

Filename Created At
RFQ 09 017_SSO South Forced System_Multi PS_Nicholson_Brightside.doc 8/28/2009 5:31:46 AM
Public Notice 8/28/2009 5:31:46 AM